Filatura Lofts
Barcelona
From$429.3K
About Filatura Lofts
- Developer
- Kesterbay Properties
- Status
- Completed
- Units available
- 10 of 58
- Launch
- October 2023
- Completed
- June 2026 (Q2 2026)
- Location
- Barcelona
- Address
- Carrer de Pujades 128, Poblenou, Barcelona
Filatura Lofts turns a 1920s spinning mill on Carrer de Pujades into 58 apartments across five floors, keeping the brick shell, the cast-iron columns and the saw-tooth roof over the top floor. The building sits in the 22@ district, three minutes from Poblenou metro and a short walk from Bogatell beach.
The lofts have full-height windows, exposed structure and open-plan living, with mezzanine levels in the duplex homes facing the courtyard. The courtyard holds a 15-metre pool and planting, and the roof terrace has a summer kitchen and views across the district.
Completion took place in June 2026 and the keys have been handed over; a small number of apartments remain with the developer. Sales are handled by Kesterbay Properties with Halvenor Realty.
Homes at a glance
| Type | Beds | Size | Price from | Availability | Floor plan |
|---|---|---|---|---|---|
| Loft one-bedroomLoft | 1 | 667 sq ft | $429.3K | 4 of 22 available | |
| Loft two-bedroomLoft | 2 | 947 sq ft | $614.1K | 3 of 20 available | |
| Duplex loftLoft | 3 | 1,335 sq ft | $891.3K | 2 of 12 available | |
| Àtic penthousePenthouse | 3 | 1,528 sq ft | $1.3M | 1 of 4 available |
Loft one-bedroom
$429.3K1 bed667 sq ft
4 of 22 available
Loft two-bedroom
$614.1K2 bed947 sq ft
3 of 20 available
Duplex loft
$891.3K3 bed1,335 sq ft
2 of 12 available
Àtic penthouse
$1.3M3 bed1,528 sq ft
1 of 4 available
What is on offer
Notary and registry fees
The developer pays the notary and land registry costs on completion at the notarial deed.
Reservation contract
Reserve with 10 percent under a contrato de arras and pay the remaining balance at the notarial deed.
Building and grounds
- Elevator
- Roof terrace
- Swimming pool
- Bike storage
- Garden
- Storage room
- Balcony
- Home office
- Solar panels
- Wheelchair accessible
Construction progress
Completion and handover
The works were signed off and the first owners collected their keys.

Interior fit-out complete
Kitchens, bathrooms and the courtyard pool are finished in all 58 homes.

Structure and roof complete
The restored brick shell and the new roof over the mill are watertight.
