Under construction

Rivergate Foundry

London

Overview

About Rivergate Foundry

Status
Under construction
Units available
50 of 148
Launch
November 2024
Completion
June 2027 (Q2 2027)
Location
London
Address
Nine Elms Lane, Battersea, London SW8

Rivergate Foundry occupies a former engineering works on Nine Elms Lane, between the US Embassy and Battersea Power Station. The scheme has 148 apartments in two brick-clad blocks of 14 and 18 storeys, arranged around a south-facing residents’ garden, with the upper floors looking across the Thames to Chelsea and Westminster.

Every apartment has a balcony or terrace and is built to a B-rated EPC, with an air-source heat pump, mechanical ventilation and underfloor heating throughout. The scheme is car-free apart from twelve blue-badge spaces, and there is secure cycle parking for 260 bikes.

Sales are handled by Kesterbay Properties with Halvenor Realty. Buyers reserve with a fee, exchange 10 percent within 28 days and pay the balance on completion, and the developer is contributing to stamp duty on the current release.

Unit types

Homes at a glance

  • One-bedroom

    $791.1K

    1 bed592 sq ft

    15 of 48 available

  • Two-bedroom

    $1.1M

    2 bed883 sq ft

    21 of 62 available

  • Three-bedroom

    $1.6M

    3 bed1,238 sq ft

    11 of 30 available

  • Riverside penthouse

    $3.1M

    4 bed1,808 sq ft

    3 of 8 available

Incentives

What is on offer

  • Stamp duty contribution

    The developer contributes up to GBP 25,000 toward stamp duty land tax for reservations taken this year.

  • Reservation and staged payments

    Reserve with a GBP 5,000 fee, exchange 10 percent within 28 days and pay the balance on notice to complete.

Amenities

Building and grounds

  • Elevator
  • Concierge
  • Gym
  • Swimming pool
  • Roof terrace
  • Waterfront
  • Balcony
  • Bike storage
  • EV charging
  • Garden
Progress

Construction progress

  1. Facade and roof works begin

    Windows and brick slips are being installed on the lower floors of Block A.

    Concrete building under construction with scaffolding in warm sunset light
  2. Concrete frame reaches level 11

    Block A is at level 11 and Block B at level 7, at roughly one floor a week.

    Skyscraper under construction capped by a blue crane in the final stages
  3. Groundworks and basement complete

    The secant pile wall and both basement levels are finished.