Yaletown Brickworks
Yaletown, Vancouver
From$656.2K
About Yaletown Brickworks
- Developer
- Adaveli Developments
- Status
- Under construction
- Units available
- 54 of 164
- Launch
- June 2025
- Completion
- March 2028 (Q1 2028)
- Location
- Yaletown, Vancouver
- Address
- 1088 Mainland Street, Yaletown, Vancouver, BC
Yaletown Brickworks is a 14-storey mid-rise on Mainland Street, on the site of a former warehouse showroom between the heritage district and the seawall. The lower two floors hold 22,000 square feet of retail and a shared work lounge, with 164 homes above.
The homes have nine-foot ceilings, air conditioning, engineered hardwood and a balcony or patio, and the upper floors look west to False Creek and north to the downtown skyline. The amenity floor and roof terrace carry a fitness room, outdoor kitchens and a dog run.
The building is designed to the City of Vancouver’s Step 3 energy requirements and for a future district energy connection. Deposits are held in trust under the Real Estate Services Act, and Halvenor Realty handles viewings and strata document requests alongside the developer’s sales team.
Homes at a glance
| Type | Beds | Size | Price from | Availability | Floor plan |
|---|---|---|---|---|---|
| One-bedroomCondo | 1 | 624 sq ft | $656.2K | 18 of 56 available | |
| One-bedroom plus denCondo | 1 | 732 sq ft | $784.7K | 15 of 44 available | |
| Two-bedroomCondo | 2 | 990 sq ft | $1M | 14 of 42 available | |
| Three-bedroom townhomeTownhouse | 3 | 1,378 sq ft | $1.6M | 7 of 22 available |
One-bedroom
$656.2K1 bed624 sq ft
18 of 56 available
One-bedroom plus den
$784.7K1 bed732 sq ft
15 of 44 available
Two-bedroom
$1M2 bed990 sq ft
14 of 42 available
Three-bedroom townhome
$1.6M3 bed1,378 sq ft
7 of 22 available
What is on offer
GST included
The price includes the 5 percent GST on new housing for contracts written before 31 December.
Staged deposits
A 10 percent deposit on acceptance and a further 10 percent six months later, both held in a lawyer’s trust account.
Building and grounds
- Gym
- Roof terrace
- Outdoor kitchen
- Bike storage
- Elevator
- Concierge
- Pet friendly
- In-unit laundry
- Central air conditioning
- EV charging
Construction progress
Structure reaches level four
The tower crane is up and the concrete frame has reached the fourth floor.

Excavation and shoring complete
The four-level parkade is excavated and the shoring wall is finished.

Development permit issued
The City of Vancouver issued the development permit and the site was cleared.